The Vault

Installation is scheduled to begin in 2018.

Whilst precise specifications of the Vault will not be made available publicly, we have included pictures of similar installations to demonstrate the strength and processes involved.

vaultconstruction

The vault is constructed of pre-fabricated concrete panels.

Grade VIII Vault - Pre Decoration

A variety of different sizes and shapes of safety deposit box will be on offer.

Grade VIII Vault Door

Decorated vault door